The Kaohsiung

International Airport runway renovation project includes a 7.5-hour nighttime task.

Yong Li is conducting 7.5-hour nighttime construction work at Kaohsiung International Airport daily.

The runway renovation was completed, employing full-section hot-joint paving, patented rapid cooling, and FOD safety control, ensuring timely and high-quality delivery and maintaining normal daytime airport operations.

 Project Summary

This project involves the runway renovation of Kaohsiung International Airport.

Yong Li needs to complete the project within a timeframe shorter than the ICAO recommended standard.

Complete the removal, overlay, and lighting restoration under constraints.

FOD clearance. Through mature runway construction methods and...

Patented equipment successfully achieves "daily construction, every..."

The task is to "resume operations daily".


  • Project Type: International Airport Runway Reconstruction
  • Construction hours: 23:30–06:50 (limited time during nighttime hours)
  • Technical highlights: Hot-bonded installation, rapid cooling technology
  • Precision planing, expansion joint suppression
  • Results: Completed on schedule and to a high standard, with work resuming promptly every morning.
  • Resumption of flight operations

Inquiry about engineering business

Contact Us

夜間高速公路上發生卡車側翻事故,救援人員和閃爍的警燈正在前往現場。
By yonglimkt August 5, 2026
ISO 9001 驗證企業穩定輸出品質的能力。永䥶集團通過 ISO 9001:2015 驗證,把品質管理落實於專業土木工程上,讓工程品質可追溯、可驗證。
Nighttime roadwork with a large dump truck and workers beside an asphalt paving machine under streetlights.
By yonglimkt August 5, 2026
傳統鋪路拉鋼線耗時且易生誤差?永䥶引進並改良取得專利「3D 鋪面系統」(M584809),利用全站儀即時測量與自動控管,免除放樣作業,提升道路與機場跑道平整度與施工效率,邁向自動化鋪路新時代。
By y2200326 August 3, 2026
永䥶集團台南學甲廠導入瑞士 AMMANN 智慧化瀝青拌合設備,整合再生材料、天然氣燃燒、污染防制、智慧監控及產品碳足跡管理,支援嘉義、臺南、高雄及屏東地區的道路與公共工程。
By yonglimkt August 3, 2026
高雄國際機場僅有單一跑道,無法全面封閉施工,必須在每日僅 23:30 至 06:50 的夜間窗口內,完成跑道整建、燈光復原與 FOD 清場,並於清晨恢復航班起降。永䥶集團解析高雄機場跑道工程挑戰,包括全斷面熱接鋪築、快速冷卻技術及 3D 鋪面系統等關鍵工法。
By yonglimkt August 3, 2026
永䥶工業取得台灣瀝青混凝土產品碳足跡標籤首例,從道路材料、生產製程到供應鏈管理,推動低碳營建、綠色採購與 ESG 工程治理。
By yonglimkt August 3, 2026
經濟日報: 從道路材料開始 永䥶推動台灣瀝青產業邁入碳足跡管理新階段
By yonglimkt June 23, 2026
專利名稱:3D 萊卡鋪路機專利 這套 3D萊卡鋪路機 是現代數位工程(Digital Construction)的核心技術,將路面工程從傳統的「經驗導向」轉型為「數據導向」。 以下為針對該技術的完整深度介紹,包含系統組件細節、數位化工作流程與核心產業優勢:
By yonglimkt June 23, 2026
專利名稱:路面快速冷卻系統 (專利號:I690639)